Klevr Product Documentation logo

KPIs

Organisations increasingly require detailed reporting on the impact of their Programs, Funds, and Projects.

Summary:

Organisations increasingly require detailed reporting on the impact of their Programs, Funds, and Projects. To support this need, we have introduced a flexible KPI tracking system within the Klevr platform. This feature enables users to define, monitor, and report on KPIs across multiple contexts such as Klevr Grants, Klevr Fundraising without being limited to a single app. The goal is to provide a scalable solution that consultants can configure for any client or project.

Feature Overview

The KPI tracking functionality is available in the following Klevr applications:

  • Klevr Fundraising
  • Klevr Grants
  • Klevr Portal Extensions

Within these apps, navigate to Settings to find the new KPIs section.

KPI Table

The KPI table includes the following fields:

  • Name: The name of the KPI (e.g., Jobs).
  • Regarding: A poly lookup to Contracts, Projects, and Programs.
  • KPI Type: A lookup field allowing users to create custom KPI types (e.g., Animals, Fundraising). These types can then be selected from a list, providing flexibility.
  • Total: Calculates the sum of all associated KPI Measures’ Total Confirmed values.
    • Example: If three KPI Measures have 5, 5, and 10 in the 'Total Confirmed' field the KPI 'Total' will display 20.
  • Total Completed: Sums the Total Confirmed values of KPI Measures where Status Reason = Completed.
    • Example: If only one KPI Measure has a Status Reason = Completed and the 'Total Confirmed' contains 5 the 'Total Completed' will display 5.

KPI Measure Table

The KPI Measure table includes:

  • Name: Descriptive name (e.g., Jobs Found).
  • Auto Number: For tracking purposes.
  • KPI Measure Type: Lookup field for custom measure types (e.g., Consulting, Movie).
  • Regarding: Poly field to Application, Contract, Programme, Project, Milestones, Objectives, Leads, Opportunity, Fund, and DCAP tables.
  • Initial Target: Locked field that captures the first value entered in the Target field.
  • Target: The target value for the KPI Measure.
  • Target Date: Optional date for achieving the target.
  • Total Confirmed: Sums 'Value' from associated KPI Entries where Status Reason = Confirmed.
  • Total: Sums all associated KPI Entry 'Value', regardless of status.
  • Outcome: Compares Total Confirmed to Target: If Total Confirmed eq or greater than Target → Outcome = Achieved, Otherwise → Outcome = Not Achieved
  • Status Reasons:
    • Active Statuses: Draft, In Progress, Review, Completed
    • Inactive Statuses: Closed, Waived

KPI Entry Table

The KPI Entry table includes:

  • Name: Descriptive name (e.g., Hours at Job).
  • Auto Number: For reporting purposes.
  • Regarding: Same lookup options as KPI Measure.
  • Value: Can represents hours, percentage, or currency (default = 1).
  • Status Reason:
    • Active: Draft, Submit
    • Inactive: Confirmed

Key Notes

All value fields (KPI, KPI Measure, KPI Entry) can represent numbers, currency, or percentages.

The system is designed for flexibility, allowing customisation to meet specific needs.

✅ Quick-Start Guide

Imagine this scenario…

You need to track the impact of a new Program. You want to measure how many jobs were created as part of this initiative. Here’s how the journey unfolds:

You head to the Settings area of the app. Among the familiar options, you notice a new section called KPIs. This is where the magic begins.

Imagine this scenario… (1)

Imagine this scenario… (1)

You click KPIs and select New. Think of this as naming the goal you want to track. For example, you type Jobs Created in the Name field.

Next, you choose a KPI Type. Maybe you create a new type called Employment Impact because that fits your program perfectly.

Finally, you link this KPI to something meaningful—like a Project or Contract—using the Regarding field.

Imagine this scenario… (2)

Imagine this scenario… (2)

Now that your KPI exists, you drill down into it and add KPI Measures. Each measure is like a milestone toward your goal. For example, you create a measure called Jobs Found and set a Target of 50. You even add a Target Date to keep things on track.

Behind the scenes, the system will calculate totals and outcomes for you. If your confirmed entries reach or exceed 50, the Outcome will automatically update to Achieved.

Imagine this scenario… (3)

Imagine this scenario… (3)

As the project progresses, you start logging actual results. You open the KPI Measure and add KPI Entries—each representing a real-world achievement. For example, you log 5 jobs in one entry and mark it as Confirmed.

The system updates your totals instantly, so you always know where you stand against your target.

Imagine this scenario… (4)

Imagine this scenario… (4)

Imagine this scenario… (5)

Imagine this scenario… (5)

Last updated on